Abbots Ripton rail accident

The Abbots Ripton rail disaster occurred on 21 January 1876 at Abbots Ripton, then in the county of Huntingdonshire, England, now in Cambridgeshire, on the Great Northern Railway main line, previously thought to be exemplary for railway safety. In the accident, the Special Scotch Express, ( known as the Flying Scotsman after 1923) train from Edinburgh to London was involved in a collision, during a blizzard,[1] with a coal train. An express travelling in the other direction then ran into the wreckage. The initial accident was caused by:

Additional factors in the second accident were:

The accident (and the subsequent inquiry into it) led to fundamental changes in British railway signalling practice.

Contents

Overview

A coal train preceding the Flying Scotsman on the main East Coast up (south-bound) line was normally scheduled to be shunted into a siding at Abbots Ripton to allow the much faster Flying Scotsman to pass. Because of a very bad snowstorm, both the coal train and the Flying Scotsman were running late and the signalman at Holme, the next station north of Abbots Ripton, judged that the coal train needed to go into sidings at Holme if it was not to delay the Flying Scotsman. He therefore set his signals to (as he thought) stop the coal train. However it continued on the main line, reached Abbots Ripton and had nearly completed shunting into the siding there when the Flying Scotsman ran into it at speed. The wreckage obstructed the down (northbound) line and a second collision occurred some minutes later when a northbound express to Leeds crashed into the wreckage. Thirteen passengers lost their lives in the collisions, and 53 passengers and 6 traincrew members were injured.

The Great Northern was operating on the block system, which was supposed to eliminate such accidents, so the accident caused considerable alarm. It was soon established that the main problem was with signals and snow:

The coal train had therefore seen nothing to make it stop at Holme, and the Flying Scotsman whilst catching up with it had run through a number of signals which had been set to 'danger' but were in fact showing 'clear'.

Narrative

Great Northern Railway equipment and practices

Geography

Abbots Ripton is about 4.5 miles (7.2 km) north of Huntingdon on the East Coast main line, on a section which in 1876 was twin track. To prevent slow (typically 20 mph (32 km/h)) goods trains obstructing fast trains such as the ‘Scotch express’ (averaging 45 mph (72 km/h) and hence unofficially nicknamed ‘The Flying Scotsman’ ) stations with ‘shunting sidings’ were provided at frequent intervals. A slow train being caught up with by a faster one would stop at the station and back into the shunting siding (clearing the main line in about 4 minutes) and emerging to resume its journey after the fast train had passed by. Abbots Ripton was one such station; for a south-bound (‘up’) train the previous shunting siding was 9.3 km (5.8 mi) further north at Holme 7 miles (11 km) south of Peterborough.

Block working

Traffic along the line was regulated by block working. Abbots Ripton and Holme had signal boxes and between them were two intermediate boxes. All controlled ‘home’ signals near the box and ‘distant’ signals about half a mile (c 800 m) before the home signals. The line was thus divided into three blocks, each roughly 2 miles (c 3.1 km) long; entry to each block was controlled by the signal box at the start of the block.[2] Shunting into the siding at Abbots Ripton took place in a fourth block. The ‘home’ signals at Abbots Ripton were interlocked with the shunting siding points and therefore whenever the points were open to the main line the Abbots Ripton home signal should be at ‘danger’.

All boxes could communicate with adjacent boxes by their block telegraph. Signals were normally kept at ‘all clear’ but were set to ‘danger’ to protect trains as follows. When a train entered a block by passing a home signal, the signalman would set the home signal to “danger”, thus preventing a following train entering the same block. The distant would also be set to 'danger'. Trains were required to stop at a home signal at ‘danger’ but were allowed to pass a distant signal at ‘danger’ this merely warning the driver of an approaching train to moderate speed so that the train could be stopped at the home signal. Both signals would be returned to “all clear” when the next box telegraphed ‘line clear’. Normally, as soon as a train was past a box’s home signal , the signalman would telegraph “line clear” to the preceding box. During foggy or snowy weather, however, when a train stopped at a station ‘line clear’ was not sent until the train had restarted, or been shunted into a siding.[3] In good weather therefore a goods being shunted into a siding at Abbots Ripton should have been protected against another train running into it by the Abbots Ripton ‘home’ and ‘distant’ signals ; in falling snow, the home and distant signals of the previous box should have given further protection and the fast train should always have been at least one full block away.

Signal boxes serving stations/sidings had , as well as the block telegraph a ‘speaking telegraph’ which allowed more sophisticated messages to be sent. For example all stations could kept informed of how late the trains were running.

Signals

The signals used on the Great Northern to work the block system were lower quadrant semaphores.[note 1] A lever in the signal box was connected by a wire (under tension, and passing over intermediate pulleys) to a counterweighted arm on the signal. To set a signal to all clear, the signalman moved a lever in his signal box ; this pulled the arm down against the counterweight until it was pointing vertically down (in which position it was hidden from view, housed in a slot in the signal upright). When the lever was moved to set the signal to danger, this did not positively drive the signal to “danger” but paid out slack in the wire and allowed the counterweight to take the arm to a horizontal position. [note 2]

By day the signal arms were clearly visible from the signal box from which they were worked; the system therefore had no repeater in the signal box to indicate to a signalman the position a signal was actually at.

In emergency the signal could be set to ‘danger’ by cutting the wire, but a heavy weight lying on the wire would keep the signal at ‘all clear’ by effectively pulling on the wire: since the signals were normally set to ‘all clear’ any fault which stopped them being moved would almost certainly keep them at ‘all clear’ as well.

At night (or in poor visibility in daytime) an oil lamp displayed a white light when the signal was at 'all clear' ; when the signal arm moved to the horizontal “danger” position it brought a red lens in front of the light, so that a (less bright) red light was then displayed to oncoming trains. In poor visibility, GNR regulations called for detonators to be laid if possible on the track at the home signal when this was set to danger; at stations where platelayers were available, this should also be done at the distant signals.

Brakes

The express trains were made up of non-bogie non-corridor four- or six-wheeler carriages. There were 13 on the Leeds express, giving a weight (including the engine and tender) of somewhat over 200 tons. At this period, other railways often had to resort to using more than one engine to maintain a high top speed,; the Great Northern (favoured with one of the best engine classes of the period – the Stirling 8-foot singles) prided itself on not doing so. As with all the other railways, though, it had considerable difficulties in stopping the trains rapidly once they were at speed. To stop a train, the driver could shut off steam, get his fireman to apply a brake [note 3] on the tender and put the engine into reverse. He had no means of applying brakes to the rest of the train; indeed most of the carriages did not have brakes. However, two or three of the carriages did, and each of the brake carriages had its own guard to apply the brakes on that carriage when (and if) he heard the driver ‘whistle for brakes’. In trials carried out after the accident under favourable conditions this was shown to bring the train to rest within 800-1150 yards when travelling at 40-45 mph. The Railway Inspectors considered that much shorter stopping distances would be possible if passenger trains were provided with continuous brakes operable by the driver, and had urged such systems be fitted. This had been resisted by the railway companies as unnecessary, unreliable, expensive and dangerous.[note 4]

Sequence of events to the first collision

The snowstorm

On the afternoon of the 21st the Peterborough-Huntingdon area was experiencing a very bad snow storm; more than one witness at the Inquiry said they had never known worse “freezing blowing and snowing...bad for seeing signals”.[4] Crucially, the snow/sleet fell onto cold ground and equipment and froze on them.[note 5][5]

The coal train

The southbound coal train had left Peterborough about 18 minutes late, and therefore with about 12 minutes less lead on the Flying Scotsman than normal. It progressed steadily to Abbots Ripton where it stopped by the signalbox (at about 6.41) and on the instructions of the Abbots Ripton signalman began to shunt (as it would normally have done) into a siding to let the Flying Scotsman overtake. The signalman urged the driver to hurry up, as he was "keeping the Scotchman standing at Wood Walton (the previous signal box)".[6]

Events at Holme

The signalman at Holme had been concerned that, because the coal train was so late, if it went to Abbots Ripton before shunting into a siding the Flying Scotsman would be delayed. To avoid this, he had decided to stop the train at Holme and put it into a siding there. He set his signals to danger, but when the coal train arrived at Holme at 6.21 pm it did not stop. He telegraphed to Abbots Ripton that the train had 'run past' the signals,[note 6][7] and told the stationmaster at Holme. As the Inquiry report noted "The evidence as to what then happened at the Holme station was unsatisfactorily given, and is not clear"

The Holme station master told the enquiry that he then sent for the platelayers; whilst waiting for them he checked the up line home signal and saw it to be at 'danger'. However , when a down express went through he noticed that one of the signals did not go to 'danger' after it had passed.[note 7][8] This appeared considerably at variance with other testimony.

The platelayers had to be sent for because they had been allowed to go home at the end of their normal working day, despite the weather. Their foreman was uneasy about this and came out of his house to watch the up distant signal whilst two trains went past: the first of these was the Manchester express, running about 13 minutes behind the Scotsman; the second a slow stopping passenger train, a further 6 minutes behind when it left Peterborough. As he feared, the signal showed a white light throughout. He put his work clothes back on and went to the signal. The arm was weighed down with snow; once he had shaken this off by working the arm up and down it showed a red light. He then walked to the station; on his way he met a platelayer despatched to the distant signal by the stationmaster.[9]

Other witnesses also gave evidence strongly suggesting that the platelayers were not summoned until after the Scotsman had passed and were not back at work until after the Manchester express had passed (c 6.50.[8]). They reported that other signals (including the up home signal) were - when first checked - in the same state as the up distant. The signalman also claimed that the stationmaster had reported the up home signal to not be working properly.

The Scotch express

The Scotsman had left Peterborough at 6.24 about 6 minutes late. It did not slacken speed for the bad weather; it passed through Holme at about 6.37, no attempt being to hold it there, and arrived at Wood Walton at 6.40. The signalman there had set his signals to 'danger' to protect the shunting at Abbots Ripton, but had not left his levers to set detonators at the home signal, nor did he supplement his fixed signals by displaying a hand-lamp from the signal box. He told the inquiry he was busy stopping a train of empty coal waggons on the down line, and because of the weather he did not hear the express until it ran past his cabin at full speed. At 6.44 the Scotsman reached Abbots Ripton, its driver having seen "nothing but white lights all the way from Peterboro". It was at full speed (40-45 mph) when it crashed into the coal train, which had not yet cleared the main line.

Damage

Some coal waggons were smashed, but the coal train engine itself was largely unscathed. The express engine derailed and veered to the right. It ended up lying on its side, beyond the down line. Behind it, its tender and two passenger carriages were obstructing the down line.

Sequence of events to the second collision

The railway workers involved were badly shaken, and took a few minutes to gather their wits.

Up line

The guard of the express then walked back up the up line towards Wood Walton, laying fog-signals (detonators) on the rails to warn any further trains to stop.[10] Despite the signals showing “all clear”, the Manchester express stopped in response to the Wood Walton signalman using a hand-lamp to show a red light from his signal-box. It finally pulled up beyond the Wood-Walton down distant signal; the Abbots Ripton up-distant signal could be seen ahead showing the clear white “all clear”.[note 8][11] It then proceeded cautiously towards Abbots Ripton, being stopped successively by the Scotsman guard waving a red hand-lamp and then by a platelayer, eventually drawing up at the rear of the wrecked Scotsman.

Down line

The fireman of the coal train similarly laid detonators on the down-line just inside the Abbots Ripton down distant signal, and was then picked up by the coal-train engine running light to Huntingdon to seek assistance. This was at the instigation of a GNR “relief clerk” (i.e. a clerk qualified to act as a ‘’locum’’ stationmaster) who had been travelling on the express.[note 9]

Speaking telegraph

The signalman was evidently dazed by the events, but after a delay he tried to send a message reporting the crash and seeking medical assistance. by the speaking telegraph to Huntingdon station to the south.[6][note 10] He prefixed the message with the special ‘SP’ code indicating top priority but the signalman at Huntingdon did not answer. The Abbots Ripon signalman kept trying to raise Huntingdon, but without success; when the Huntingdon signalman did answer he first refused to accept any message not starting with a code to indicate time sent, and rebuffed subsequent sends with an 'MQ' code - roughly translating as "Go away, I'm busy". Indeed he was; he was accepting the Leeds express and passing it on to the next signal box.

Block telegraph

On being aware that both the up and down lines were blocked, the Abbots Ripton signalman should have set his signals in both directions to “danger” and used the block telegraph to send the special “line blocked” message – 5 beats/rings to the signal boxes controlling the adjacent blocks. In his confused state, he set his signals but became bogged down in his dealings with Huntingdon and did not send the “line blocked” signal until 6.52 (i.e. about 8 minutes after the accident).

The Leeds express

The down Leeds express passed through Huntingdon at about 6.49 (at which time no message had been accepted there from Abbots Ripton) and reached Stukeley (the signal box for the block immediately south of Abbots Ripton) at 6.52. The signal man at Stukeley received the “line blocked” message seconds after the express had passed. The Abbots Ripton down distant signal was showing “all clear” and the Leeds express approached it at full speed.

I found a white light at the distant signal at Abbotts Ripton. After passing that signal post, I was alarmed by passing over two fog-signals which exploded; I at once shut off steam and told my mate to put on the tender break. I was then going at 40 or 50 miles an hour. In another instant I met an engine on the up road giving sharp whistles,[note 11] and saw a red lamp from it, which I took to mean that there was something out of the ordinary way. I reversed my engine, and reapplied my steam, and as soon as that was done the collision occurred[12]

The Leeds express ploughed through the tender and carriages blocking the line (this, rather than the first collision, is when most -if not all- of the deaths are thought to have occurred).

Speaking telegraph (again)

The Abbots Ripton signalman had just started his 12-hour shift at 6 p.m. His colleague on the day shift returned to work on hearing of the first collision, arriving soon after the second collision. He took over the speaking telegraph, because whilst the duty signalman appeared to be doing his best to send the message he was confused at the time, and I felt I was more able to send the message than he Messages seeking assistance were then sent to Huntingdon and Peterborough.

Inquiry

A Court of Inquiry was convened, and took evidence from 24 January to 17 February, issuing its report on 23 February. The inquiry rejected the conclusion of the coroner’s jury that the block system was at fault and ‘’had proved ineffective in a case of emergency”, riposting ‘’such a conclusion, natural enough on a superficial view to those who are not thoroughly versed in the subject, really results from a confusion of ideas’’. The problem was with signals, and any system of working railways must be ineffective if signals could not be relied upon.

Findings

The immediate cause was the accumulation of snow on the semaphore arms (and/or control wire) of several sets of signals.[note 12] On the night of the accident the weight of snow on some signal arms meant that the arm balanced well short of the 'danger' position and that the spectacle plate failed to drop sufficiently to move a red lens in front of the white lamp displayed in the "all clear" position. The signal therefore showed a clear white light (apparently "all clear") when the lever in the signal box was set to danger; the snow and ice (in the words of the Inquiry Report) thus rendering the signals to be

not only useless for warning by red-lights the engine-driver of the Scotch-express-train, but also a means by the exhibition of white lights of luring him forward at full speed to the collision

The enquiry had heard evidence from experienced working-level witnesses that this (or a milder manifestation of this) was a known problem on snowy days but could easily be fixed if you knew how e.g. by "jiggling the arms". It implicitly rejected the evidence from GNR senior managers who denied that there was any prior history of problems, but made no comment on the discrepancy. [note 13]

Operating practice at that time was that the signals were left in the "clear" position continuously unless it was required to protect a static obstruction. Consequently the signals stood at clear for considerable periods of time, and there was little opportunity to spot the problem.

The inquiry report noted various suggested improvements to signal arrangements, but cautioned against over-elaborate solutions

It is well that these and other proposals for improvement, which are constantly invented or advocated, such as combining sight with sound at the signals, and the use of detonators, mechanically applied, to supersede the use of fogmen, should receive full consideration and discussion, after the experience of so terrible an accident, caused mainly by the failure of existing signal-arrangements. But, in the course of such deliberations, the facts must not be lost sight of, that men are still liable to make mistakes, machinery is still liable to fail, and further complication is by no means certain in all cases to produce greater safety

It commented adversely

on the performance of individuals
and without blaming an individual on

Recommendations

The Board of Trade had no regulatory powers to enforce the recommendations of the inquiry report. The most important were:

Consequences

Over a longer timescale, and after further accidents

Notes and references

Notes
  1. ^ for a drawing & description see http://www.railsigns.co.uk/sect2page1/sect2page1.html
  2. ^ An intermediate position with the arm pointing downwards at 45 degrees to the signal upright had been used to indicate ‘proceed with caution’ when working to the time interval system. The position was no longer used in the block system, but some witnesses in the inquiry used it as a point of reference for how far below horizontal the signal arms were dipping
  3. ^ To avoid confusion, modern spelling is used, but the prevailing spelling at the time was "break"
  4. ^ Dangerous because it would not increase safety margins once engine drivers realised it allowed them to go faster and/or brake later in safety – similar to the counter-intuitive argument now applied (apparently with some validity) against making cars safer for their drivers - and they would be in a worst case if the brakes failed
  5. ^ Further north telegraph wires accumulated ice to a diameter of 3 inches (75mm) and brought the telegraph poles down
  6. ^ to let Abbots Ripton know they would be shunting the coal train into the siding, not as a warning about signals misbehaving
  7. ^ If true, this would be about 6.25, and hence after the Scotsman had left Peterborough (6.24)
  8. ^ which would imply that it took over a mile to stop
  9. ^ If Abbots Ripton had a station master on duty that night he did not give evidence to the inquiry, nor do other witnesses mention him
  10. ^ There were two signal boxes at Huntingdon; Huntingdon North and Huntingdon South; both were on the ‘speaking telegraph’ – to contact the stationmaster at Huntingdon to get assistance Abbots Ripton should have 'spoken' to Huntingdon South (which is what he did, or rather attempted); to maximise the chances of getting the train held Huntingdon North (which he did not)
  11. ^ The coal train engine going to Huntingdon for help Elsewhere Wilson says he ‘whistled for brakes’. The three guards on the express all told the enquiry they applied their brake in response to the whistles of the coal train engine
  12. ^ Popular retellings (including L T C Rolt Red for Danger a standard compendium of British rail accidents) talk of the arm being frozen in the slot but there is no direct statement to that effect in the Inquiry evidence, multiple mentions of the arm having risen part-way, and of the corrective action being to dislodge snow from the partly risen arm. On further inspection, other details in Rolt's account (generally the more dramatic ones) don't match the Inquiry evidence.
  13. ^ No GNR documentation of the problem or how to fix it emerged, nor did all the signalmen and platelayers say they had heard of it; that would tend to suggest that GNR senior management were genuinely unaware.
  14. ^ the evidence would clearly have supported mentioning the Abbots Ripton duty signalman as responsible. The Inquiry report instead considered it unfortunate that he had not retained his prresence of mind, but immediately went on to note that he had attempted to speak Huntingdon within a minute of the crash; the inference is that the inquiry did not think him blameworthy
References
  1. ^ [1], Report of the Court of Inquiry into the Circumstances Attending the Double Collision on the Great Northern Railway which occurred at Abbotts Ripton on the 21st January 1876, HMSO, 1876
  2. ^ Inquiry - evidence of Richard Johnson
  3. ^ Inquiry - evidence of Francis P Cockshutt
  4. ^ Inquiry; evidence of William Wilson
  5. ^ Inquiry; evidence of William Henry Preece,
  6. ^ a b Inquiry - evidence of Charles William Johnson
  7. ^ Inquiry - evidence of John Collins Osborne
  8. ^ a b , Inquiry - evidence of George Thomas Gregory.
  9. ^ Inquiry - evidence of George Gammons
  10. ^ Inquiry - evidence of Charles Day
  11. ^ Inquiry - evidence of William Edis
  12. ^ Inquiry – evidence of William Wilson

External links